TTC Workshop – Fluidized Bed: Maintenance & Troubleshooting 7 – 9 July 2015

 

TTC Workshop – Fluidized Bed: Maintenance & Troubleshooting 7 – 9 July 2015

Considering the trend towards prolonged operation time of production lines (up to 24 hours), breakdowns become almost unacceptable. Hence, an almost continuous operation of the facilities has to be warranted by preventive servicing and rapid detection and repair of malfunctions. This workshop provides a fundamental introduction to the Glatt philosophy of controls, documentation and RI-diagrams and is followed by an extensive practical trouble shooting session.

 

 

 

You might also like